11 24 am
some updates
1. i had only 2 interview in november, 1 pissed me off and the other blacklist me already. Applied to another position also.
2. made order for 2 GB 32 GB ram so it can all become 128 GB ram in my CPU.
3. completed the presidents office, and security set and dressing for the station. now i am making the doors for all room and sections, the scale, and height also need to be adjusted for the chamfering. at the same time i will also need to make the milk tea and lamp for president office and the kitchen and a few other small stuff. UV's can be done in between.
4. this year have not been much but i will keep on applying. maybe i will have a job offer next year.
so here is a image of hows things are
4. this year have not been much but i will keep on applying. maybe i will have a job offer next year.
so here is a image of hows things are
at moment this is the production photos on the station, i will share more later when i full replace all prototypes/blockouts and dressing with detail assets. be patient with me.


No comments:
Post a Comment